新聞
風(fēng)管安裝為什么要采用預(yù)制加工技術(shù)?
發(fā)布人:http://www.bnlfans.net 發(fā)布時(shí)間:2023-04-24 12:01:27
實(shí)際上,在民用建筑工程中,風(fēng)管安裝已經(jīng)普遍采用預(yù)制加工技術(shù),相比以前的現(xiàn)場加工安裝,其優(yōu)勢多多。這里濟(jì)南風(fēng)管加工廠就來舉一個(gè)工程示例,來看一看風(fēng)管預(yù)制加工安裝的施工流程。
In fact, in civil construction projects, prefabricated processing technology has been widely used for the installation of air ducts, which has many advantages compared to previous on-site processing and installation. Here, Jinan Air Pipe Processing Factory will provide an engineering example to take a look at the construction process of prefabrication, processing, and installation of air pipes.
風(fēng)管安裝采用預(yù)制加工技術(shù)優(yōu)勢多多
There are many advantages of using prefabricated processing technology for air duct installation
不受施工場地的局限:工廠化預(yù)制將大量材料原材料加工任務(wù)搬離了施工現(xiàn)場,可以減少加工場地對現(xiàn)場的占用及依賴。
Not limited by the construction site: Factory prefabrication removes a large amount of material processing tasks from the construction site, which can reduce the occupation and dependence of the processing site on the site.
縮短現(xiàn)場施工工期:工廠化預(yù)制將部分施工任務(wù)搬離了施工現(xiàn)場,在現(xiàn)場機(jī)電工作面還沒有的時(shí)候預(yù)制即可提前開始,并且大幅度提高構(gòu)件制造的生產(chǎn)效率。
Shortening the on-site construction period: Factory prefabrication has moved some construction tasks away from the construction site, and prefabrication can start in advance before the on-site mechanical and electrical working surface is available, greatly improving the production efficiency of component manufacturing.
減少材料損耗:在預(yù)制加工,風(fēng)管集中加工,自始終由一個(gè)作業(yè)組負(fù)責(zé)下料,做到“量體取材”,避免了現(xiàn)場材料亂截現(xiàn)、大材小用等現(xiàn)象。
Reduce material loss: In the prefabrication processing center, the air ducts are processed in a centralized manner, and a single operation team is responsible for cutting materials from beginning to end, achieving the goal of "measuring and selecting materials", avoiding phenomena such as random cutting and overuse of materials on site.
風(fēng)管預(yù)制加工安裝流程的實(shí)例展示:
Example demonstration of the prefabrication, processing, and installation process of air ducts:
深化設(shè)計(jì)
Deepening design
結(jié)合預(yù)制工作需求,確定預(yù)制件類型,確定預(yù)制標(biāo)準(zhǔn)。通過軟件將BIM模型轉(zhuǎn)換成裝配圖,交付工廠下料加工。
Based on the needs of prefabrication work, determine the type of prefabricated components and determine the prefabrication standards. Convert BIM models into assembly drawings through software and deliver them to the factory for cutting and processing.
場外加工
Off site processing
場外加工根據(jù)拿到料單進(jìn)行預(yù)制工作,進(jìn)行五步流程:
The off-site processing center performs prefabrication work according to the received material list, and carries out a five step process:
排布
Layout
↓
↓
下料
Blanking
↓
↓
滾邊
Rolling edge
↓
↓
裝箱
Packing
↓
↓
出廠
Ex-works
現(xiàn)場施工
On site construction
現(xiàn)場施工流程:
On site construction process:
手持式滾邊機(jī)滾邊
Handheld edge rolling machine edge rolling
↓
↓
碰焊機(jī)焊接法蘭
Butt welding machine welding flange
↓
↓
拼裝好的風(fēng)管
Assembled air duct
↓
↓
三節(jié)風(fēng)管標(biāo)準(zhǔn)節(jié)
Three standard sections of air ducts
↓
↓
水平提升平臺安裝風(fēng)管
Horizontal lifting platform installation air duct
風(fēng)管安裝為什么要采用預(yù)制加工技術(shù)呢?針對這個(gè)問題,小編就從講解完畢了,希望能夠給您好的幫助,更多事項(xiàng)就來我們網(wǎng)站http://www.bnlfans.net咨詢了解吧!
Why should prefabricated processing technology be used for air duct installation? The editor has finished explaining this issue and hopes to provide you with good help. For more information, please come to our website http://www.bnlfans.net Consult and understand!
上一篇:鐵皮風(fēng)管加工的注意事項(xiàng)
下一篇:風(fēng)管加工過程中出現(xiàn)問題怎么避免?
相關(guān)