人防通風管道安裝注意事項及風量調整
發布人:http://www.bnlfans.net 發布時間:2022-06-22 11:22:00
人防地下室平時和戰時功能是不同的,按平時使用功能分主要有地下車庫、地下商業設施、庫房等;按戰時使用功能分有指揮通信工程、醫療救護工程、防空隊工程、人員掩蔽工程和配套工程;
The civil air defense basement has different functions in peacetime and wartime. According to its functions in peacetime, it mainly includes underground garage, underground commercial facilities, warehouse, etc; According to wartime use functions, it is divided into command and communication engineering, medical rescue engineering, air defense professional team engineering, personnel Shelter Engineering and supporting engineering;
因此其通風管道的設計安裝一定要充分考慮到不同實際使用情況下的使用;在設計初期就將人防和消防同時考慮,使平時風管、排煙機房及豎井與戰時的進、排風系統、進風機房、濾毒室以及戰時干廁和每個口部的布置更加合理。
Therefore, the design and installation of the ventilation duct must fully consider the use under different actual use conditions; At the early stage of design, civil air defense and fire protection will be considered at the same time, so as to make the layout of air duct, smoke exhaust machine room and shaft in peacetime more reasonable than that of air inlet and exhaust system, air inlet machine room, poison filter room in wartime, dry toilet and each mouth in wartime.
一般人防通風系統中,當通風管由擴散室后墻穿入時,通風管端部應設置向下的彎頭。擴散室到風機前段風管應采用鋼管焊接,風機采用軟接頭連接;
In general civil air defense ventilation system, when the ventilation pipe passes through the rear wall of the diffusion chamber, a downward elbow shall be set at the end of the ventilation pipe. The air duct from the diffusion chamber to the front section of the fan shall be welded with steel pipes, and the fan shall be connected with soft joints;
同時,氣密性測量管,壓差測量管,放射性監測取樣管,尾氣監測取樣管不能遺漏。
At the same time, the air tightness measuring pipe, differential pressure measuring pipe, radioactive monitoring sampling pipe and tail gas monitoring sampling pipe shall not be omitted.
人防通風系統在安裝完成后,要按設計要求調整送風和回風各干支管道、各送回風口、空調機風量;測定實測風量并固定風閥;所有環節全部投入,一般舒適性空調系統連續運轉24小時以上。
After the installation of the civil air defense ventilation system, the air volume of the air supply and return main and branch pipes, return air outlets and air conditioners shall be adjusted according to the design requirements; Measure the measured air volume and fix the air valve; All links are put into operation, and the general comfort air conditioning system operates continuously for more than 24 hours.
通風系統調試完成后,及時整理資料并編制報告,主要內容有:
After the commissioning of the ventilation system is completed, the data shall be sorted out in time and the report shall be prepared. The main contents include:
1.電氣、設備、自控等單體試驗
1. electrical, equipment, automatic control and other individual tests
2.測試、信號、保護裝置的調試數據。
2. commissioning data of test, signal and protection devices.
3.系統風量調整結果。
3. system air volume adjustment results.
以上就是濟南通風管道為大家介紹的內容,感謝您在百忙之中查看我公司的信息內容,如果您想要了解的更多,歡迎您來電進行咨詢! http://www.bnlfans.net
The above is what Jinan ventilation duct introduced to you. Thank you for checking the information of our company in your busy schedule. If you want to know more, you are welcome to call us for consultation! http://www.bnlfans.net