安裝通風(fēng)管道需要的主要的三個(gè)事項(xiàng)

發(fā)布人:http://www.bnlfans.net   發(fā)布時(shí)間:2018-04-26 17:03:38

(一) 作業(yè)條件

(I) operating conditions

1、 一般排風(fēng)機(jī)系統(tǒng)和空調(diào)系統(tǒng)的安裝,要在建筑物圍護(hù)結(jié)構(gòu)施工完,障礙物已清理,地面無雜物的條件下進(jìn)行。

1, the installation of general exhaust fan system and air conditioning system should be carried out under the condition of the completion of the building's enclosure structure, the clearance of obstacles and the absence of sundries on the ground.

武漢通風(fēng)管道加工

Wuhan ventilation pipe processing

2、 對空氣潔凈系統(tǒng)的安裝,應(yīng)在建筑物內(nèi)部安裝部件的地面做好,墻面已抹灰完畢,室內(nèi)無灰塵飛揚(yáng)或有防塵措施的條件下進(jìn)行。

2. The installation of air cleaning system should be done in the interior of the building. The wall has been plastered, without dust flying in the room or under the conditions of dust prevention measures.

3、 一般除塵系統(tǒng)風(fēng)管安裝宜在廠房的工藝設(shè)備安裝完或設(shè)備基礎(chǔ)己確定,設(shè)備連接器、罩體方位已知的情況下進(jìn)行。

3. The installation of the wind pipe in the general dust removal system should be carried out in the case of the installation of the process equipment or the base of the equipment, and the known position of the equipment connector and the cover body.

4、 檢查現(xiàn)場預(yù)留孔洞位置、尺寸應(yīng)符合圖紙要求,每邊比實(shí)際截面大100mm。

4. The location and size of the reserved holes should be in accordance with the requirements of the drawings. Each side is larger than the actual section 100mm.

20170427115450150.jpg

5、 作業(yè)地點(diǎn)要有相應(yīng)的輔助設(shè)施,如梯子、架子、防護(hù)、消防器材,并有施工員的技術(shù)、質(zhì)量、交底。

5, the operation site should have the corresponding auxiliary facilities, such as ladder, rack, safety protection, fire fighting equipment, and have the technical, quality and safety of the builder.

(二) 材料要求

(two) material requirements

1、 各類板材、管材等應(yīng)有質(zhì)量證明文件(包括出廠合格證、質(zhì)量合格證明及檢測報(bào)告等)和產(chǎn)品清單。

1, all kinds of plates, pipes and other quality documents should be included (including factory qualification certificate, quality certificate and test report) and product list.

2、 風(fēng)管成品不允許有變形、扭曲、開裂、孔洞、法蘭脫落、開焊、漏鉚、漏打螺栓孔等缺陷。

2, the wind pipe products are not allowed to have deformation, distortion, cracking, holes, flange shedding, welding, leakage riveting, missing bolts holes and other defects.

3、 安裝的閥體消聲器、罩體、風(fēng)口等部件應(yīng)檢查調(diào)節(jié)裝置是否靈活,消聲片、油漆層有無損傷。

3, installation of valve muffler, hood, tuyere and other components should check whether the adjustment device is flexible, whether the silencer and paint layer are damaged.

武漢通風(fēng)管道加工

Wuhan ventilation pipe processing

4、 安裝使用的材料:螺栓、螺母、墊圈、墊料、密封條、自攻螺釘、拉鉚釘、電焊條、各種帆布、無紡布、射釘、膨脹螺栓等應(yīng)符合產(chǎn)品質(zhì)量要求。

4, installation and use of materials: bolts, nuts, gaskets, cushion materials, sealing strips, self tapping screws, pull rivets, electric welding strips, all kinds of canvas, non-woven fabric, nail, expansion bolt, etc. should meet the quality requirements of the product.

(三) 施工機(jī)具

(three) construction machinery

手錘、電錘、手電鉆、手鋸、電動(dòng)雙刃剪、砂輪鋸、角向磨光機(jī)、臺(tái)鉆、電氣焊具、扳手、改錐、手剪、倒鏈、高凳、大繩、尖沖、射釘槍、刷子等。

Hand hammer, hammer, handsaw, hand saw, electric double edge scissors, wheel saws, angular grinder, table drill, electric welding tool, wrench, tapes, hand scissors, inverted chain, high stool, large rope, sharp punching, nail gun, brush and so on.


上一篇:降低通風(fēng)機(jī)聲源噪聲有哪些方法?
下一篇:油煙凈化器工作原理及特點(diǎn)

網(wǎng)站首頁 關(guān)于我們 產(chǎn)品展示 新聞中心 工程案例 在線留言 聯(lián)系我們

主站蜘蛛池模板: 国产男女无遮挡猛进猛出| 久久精品中文字幕| 国产剧果冻传媒星空在线播放| www.天天操.com| 1卡2卡三卡4卡国产| 国产剧情jvid在线观看| 中国大陆国产高清aⅴ毛片| 激情偷乱在线观看视频播放| h在线观看网站| www.米奇777.com| 中文字幕国产在线观看| 厨房切底征服麻麻| 无码日韩精品一区二区免费| 三个黑人上我一个经过| 羞羞漫画小舞被黄漫免费| 国产无套粉嫩白浆在线观看| 国产色综合久久无码有码| 国产欧美一区二区三区视频在线观看| 牛牛在线精品免费视频观看 | 免费精品国产| 黑人xxxx日本| 中文字幕精品视频在线| 高清潢色大片| 精品视频一区二区三区在线观看 | 黑人一个接一个上来糟蹋| 国产精品国产三级国快看| 草草影院ccyy国产日本欧美| 亚洲国产精品自产在线播放| 欧美性猛交xxxx乱大交丰满| 欧美三级免费观看| 麻豆约会| 大黑人xxx| 成人做受120视频试看| 韩国三级电影网| 美国式禁忌3在线观看| 三上悠亚伦理| 亲密爱人在线观看韩剧完整版免费| 国产伦子沙发午休| 亚洲欧洲精品成人久久曰| 久久综合狠狠综合久久综合88| 久久国产乱子伦免费精品|